2025 at a glance


Our sustainability commitments matter. They protect the environment, support communities, reduce risk, and ensure the company remains viable and competitive in a world where responsible mining is non‑negotiable.

Revenue

(2024: $5.8bn)

Gold production

(2024: 2.66Moz)

Gold Mineral Reserve

(2024: 31.2Moz)

People employed

employees and contractors on average

(2024: 36,496)

Total recordable injury frequency rate (TRIFR)

(2024: 0.98)

Training and development expenditure

(2024: $7.99m)

Salaries, wages and benefits paid to employees

(2024: $796m)

Community investment

(2024: $20.56m)

Expenditure with local suppliers

(2024: $4.26bn (92%))

Grievances resolved

(2024: 93%)

Reportable environmental incidents

(2024: 1)

Cumulative amount of land rehabilitated

(2024: 4,271ha)

Renewable energy supply

(2024: 6.6%)

Scope 1 and Scope 2 greenhouse gas (GHG) emissions

(2024: 1.473Mt)

Employees that completed ethics training*

(2024: 5,697)

Payments to government ∧

(2024: $1.03bn)

Security personnel trained on human rights policies

(2024: 100%)

Excludes Centamin

Excludes Kibali

* Excludes contractors

Refer to ESG Data Workbook for breakdown

Leadership


Determining materiality


We are cognisant that material sustainability issues change over time (dynamic materiality), and we will continue to monitor the broader range of issues, including emerging issues.

While we have grouped the sustainability issues identified into related environment, social, governance and economic topics, we recognise that these issues are deeply interrelated and inter-dependent and should be considered and managed accordingly.

The Company’s double materiality assessment is integrated into the Enterprise Risk Management (ERM) framework ensuring the Company considers a comprehensive view of risks and opportunities that may affect not only its financial outcomes but also its broader societal and environmental responsibilities.

Our 2025 materiality assessment included detailed interviews with key internal and external stakeholders, and considered new and emerging disclosure regulations including GRI and SASB. Extractives and mineral processing are among the first industries scheduled for updated SASB-aligned guidance, with new emphasis expected in areas such as biodiversity, water use, tailings, land disturbance, workforce conditions, closure planning and community impacts. These developments informed our framing of material sustainability issues this year, ensuring that our prioritisation reflects future regulatory direction rather than only historical expectations.

Impact materiality

Whether a matter is material from an impact perspective, that is, whether AngloGold Ashanti’s activities have a material actual or potential impact, positive or negative, on people, society and/or the environment over the short, medium or long term.

Financial materiality

Whether a matter is material from a financial perspective and whether it triggers potential or actual financial effects on AngloGold Ashanti, that is, whether it leads to risks or opportunities that influence or could influence future cash flows and the enterprise value of the Company in the short, medium or long term.

Initial benchmarking involved a thorough review of global standards and voluntary compacts to which we subscribe and align with, peer practices and feedback from ratings agencies, as well as prior year assessments.This benchmarking ensured that the issues considered are relevant, comprehensive and reflect both industry best practice and stakeholder expectations. We then arrived at a comprehensive long list of sustainability topics relevant to AngloGold Ashanti’s footprint and industry context, which we carefully refined to identify 33 issues that are relevant to our industry and sector.

We held structured interviews with internal and external stakeholders/leaders to understand:

  • Strategic priorities
  • Operational challenges and dependencies
  • Regional sustainability expectations
  • Emerging risks and opportunities

This process resulted in a refined list of 21 material sustainability issues, including new issues, strengthened definitions, and determining how issues influence our ability to create, sustain, or potentially erode social, environmental, and economic value from both an impact and financial materiality perspective.

Finally, members of executive and senior management were asked to rank issues from the perspective of both impact and financial materiality, based on our definitions (alongside). Respondents were also asked to indicate the time horizon –short, medium and long term – associated with impacts and, for financial materiality, whether the issue was primarily a risk or an opportunity.

These issues were then reviewed by the internal sustainability team. The ranking was adjusted to reflect broader industry sustainability issues and issues raised by stakeholders. These results were analysed and combined with internal insights to determine the 17 material sustainability issues for 2025.

Our commitments


Case studies


Assurance


As a member of the International Council on Mining & Metals (ICMM), AngloGold Ashanti plc is committed to obtaining independent external assurance over its conformance with the ICMM Mining Principles, including specified disclosures presented in its 2025 Sustainability Report

Our Water Management Standard ensures a consistent framework is applied across the entire mining life cycle. Regardless of whether our operations are located in water-scarce or water-abundant regions, we use comprehensive water balance models to monitor usage and identify catchment-specific risks. This data-driven approach allows us to set tailored objectives for optimising withdrawal and consumption.

Our primary operational goals are compliance and efficiency. Where feasible, we implement closed-loop systems that recycle process water, eliminating the need for environmental discharge. In regions with high rainfall where discharge is required to manage excess runoff, we apply treatment processes to ensure all water leaving our sites maintains appropriate water quality standards and aligns with regional catchment priorities.

Our commitment

We believe that water should be used in a way that is socially equitable, environmentally sustainable and economically beneficial.

As responsible stewards of environmental resources, AngloGold Ashanti is committed to minimising our consumption of water and our impacts on local and regional water resources.

All our operations work to optimise their consumptive water use and achieve their water quality objectives. They do this with the support of a calibrated water balance model and guard against compromising the water supply of local communities and downstream ecosystems.

We recognise that climate change is forecasted to alter rainfall intensity and water availability, hence a systematic and adaptive approach to water stewardship is vital to our business and the communities around us.

  • Standardisation and co-ordination of our approach to water management across the business
  • Roll out site-specific water stewardship goals
  • Inclusion of water management as a management performance measure
  • Collaboration with other stakeholders to improve sustainable water use

Performance in 2025

Over 2025, our Water Stewardship initiative advanced a portfolio of one-to-two-year projects designed to deliver value-adding water stewardship goals adapted to each mine’s local context. These spanned internal operational efficiency improvements, to enhanced water security and resilience within our host catchments. Oversight by the Water Stewardship Committee ensured projects were tracked rigorously against their agreed schedule and sustainability milestones, reflecting commitment
to ‘inside-the-fence’ engineering excellence and ‘outside-the-fence’ community partnership. The year’s progress demonstrates a maturing approach to water management – spanning enhanced industrial water recycling, application of nature-based solutions and community Water, Sanitation, and Hygiene (WASH) improvements.

In the Australia region, the primary focus remained on increasing water reuse and leveraging data for better decision making. At Sunrise Dam, significant progress was made on the construction of a new Wastewater Treatment Plant (WWTP), which will treat effluent for reuse in the processing plant, thereby reducing potable water withdrawals from Laverton. This was complemented by the rollout of a digital Potable Water Dashboard, which allows for real-time monitoring to drive reduced wastage. Similarly, Tropicana advanced its water efficiency infrastructure by commencing civil construction on a sediment settling pond to enhance underground water reuse, expanded its TSF seepage recovery strategy to explore curtain drain designs for improved management of groundwater mounding adjacent to its TSF, and is working to improve long-term sustainability of its primary water supply aquifers.

Our African operations placed a strong emphasis on community access and regional watershed governance. In Guinea, the Siguiri mine expanded reliable access to clean water by drilling and equipping boreholes across multiple host communities, despite the logistical challenges posed by seasonal flooding. In Ghana, Iduapriem advanced a strategic partnership with the Ghana Water Company to assess the feasibility of using mine pit water as an alternative raw water source for the Tarkwa municipality, while Obuasi continued its work to catalyse the formation of the Pra Basin Board for improved regional water governance. Furthermore, Geita in Tanzania received regulatory approval to trial mechanical evaporation of excess TSF water and continued its in-situ bioremediation project to safeguard downstream groundwater quality.

In the Americas, projects were characterised by environmental restoration and discharge reduction. The Cuiabá complex in Brazil successfully advanced its ‘Calcinados’ project to separate clean water from tailings, while simultaneously executing a landscape restoration initiative that included planting over 40,000 seedlings and providing environmental education to over 8,500 local residents. Meanwhile, Cerro Vanguardia in Argentina reinforced community trust through its participatory water monitoring programme, while implementing water recirculation in diamond drilling that yielded significant reductions in both water and diesel consumption.

This year’s progress moved projects closer to attaining their goal(s) expected by 2026, but by combining technical innovation with stakeholder inclusivity, we have already seen improvements in our operational water metrics and have contributed meaningfully to the health and sustainability of the water catchments we share.

Cumulative water withdrawals for 2025 totalled 35,992ML (2024: 26,424ML), 36% higher than the previous year. The inclusion of Sukari into the portfolio accounted for the majority (29%) of this increase, with the balance (7%) spread amongst operations in Latin America and Australia.

Group water withdrawal intensity increased 0.6% to 668L/tonne treated, from 632L/ tonne in 2024. This was ascribed to increased throughput in LATAM operations, including at the restarted Queiroz Process Plant in Brazil and vastly reduced rainfall in Australia (compared to 2024), necessitating increased imports of hyper-saline water.

Water withdrawal by location (ML)
Percentage of sites by stress category

Source: WRI Aqueduct Water Risk Atlas, based on Unimproved/ No drinking water metric and calibrated with local site knowledge.

  • Ensuring water security and stewardship
  • Ensuring safety, health and overall wellbeing of employees and communities
  • Securing and maintaining regulatory compliance, including environmental licences and permits

For more information on principal risks see the 2025 Annual Report

  • Failure to maintain social licence to operate
  • Failure to maintain sufficient resilience to external financial drivers
  • GRI 303-1: Interactions with water as a shared resource
  • GRI 303-3: Water withdrawal
  • GRI 303-4: Water discharge
  • GRI 303-5: Water consumption
  • GRI 14.7: Water and effluents
  • SASB EM-MM-140a.1: (1) Total water withdrawn, (2) total water consumed; percentage of each in regions with High or Extremely High Baseline Water Stress
  • ICMM SERF Indicator 8: Capacity and institution support
  • ICMM Responsible Mining Principle 6: Environmental performance: Pursue continual improvement in environmental performance issues, such as water stewardship, energy use and climate change.
  • WGC Responsible Gold Mining Principle 10: Water, energy and climate change: We will improve the efficiency of our use of water and energy, recognising that the impacts of climate change and water constraints may increasingly become a threat to the locations where we work and a risk to our licence to operate.
RA | Water consumption (megalitres)

(2024: 40,170)

Water intensity (kilolitres per tonne treated)

(2024: 0.63)

RA | Water withdrawal (megalitres)

(2024: 26,424)

RA | Water withdrawal (ML)
RA | Volume of water reused (megalitres)

(2024: 111,999*)

* Reported volume for 2024 revised

RA | Water discharged to surface water systems (megalitres)

(2024: 6,066)

Water sources by climatic type (%)

(2024: 13,326ML)

(2024: 13,073ML)

(2024: 0ML)

(2024: 25ML)

(2024: 19,832ML)

(dewatering and other environmental flows)

(2024: 111,999ML)*








(2024: 40,779ML)

(via evaporation, entrainment
and other task losses)

(2024: 6,066ML)

(to surface water)

(to surface water)

RA | Reasonable Assurance for all figures

Looking ahead

  • Completion of 2025/2026 water stewardship projects to ensure goals are realised and gains are sustained
  • Exploring development of unique context-based water metrics for operational assets
  • Integrating final CMSI requirements into an updated AngloGold Ashanti Water Management Standard

Disclaimer

This webpage does not purport to be a complete summary of the applicable underlying report and is qualified in its entirety by reference to the applicable underlying report. This webpage should be read in conjunction with the applicable underlying report, including the qualifications and limitations described therein, as there may be information in the applicable underlying report that may be important.

All Mineral Resource and Mineral Reserve information should be read in conjunction with Item 4D. Mineral Resource and Mineral Reserve in AngloGold Ashanti’s annual report on Form-20F for the fiscal year ended 31 December 2025, as filed with the U.S. Securities and Exchange Commission, as well as AngloGold Ashanti’s 2025 Mineral Resource and Mineral Reserve Report.

Forward-looking statements

Certain statements contained in this webpage, other than statements of historical fact, including, without limitation, those concerning the economic outlook for the gold mining industry, expectations regarding gold prices, production, mine life, total cash costs, all-in sustaining costs, cost savings and other operating results, return on equity, productivity improvements, growth prospects, preliminary financial and production metrics for in-process projects, the ability to convert Mineral Resource into Mineral Reserve and replace Mineral Reserves net of depletion from production and outlook of AngloGold Ashanti’s operations, individually or in the aggregate, including the achievement of project milestones, commencement and completion of commercial operations of certain of AngloGold Ashanti’s exploration and production projects and the completion of acquisitions, dispositions or joint venture transactions, AngloGold Ashanti’s liquidity and capital resources and capital expenditures and the outcome and consequences of any potential or pending litigation or regulatory proceedings or environmental, health and safety issues, are forward-looking statements regarding AngloGold Ashanti’s financial reports, operations, economic performance and financial condition.

These forward-looking statements or forecasts are not based on historical facts, but rather reflect our current beliefs and expectations concerning future events and generally may be identified by the use of forward-looking words, phrases and expressions such as “believe”, “expect”, “aim”, “anticipate”, “intend”, “foresee”, “forecast”, “predict”, “project”, “estimate”, “likely”, “may”, “might”, “could”, “should”, “would”, “seek”, “plan”, “scheduled”, “possible”, “continue”, “potential”, “outlook”, “target” or other similar words, phrases, and expressions; provided that the absence thereof does not mean that a statement is not forward-looking. Similarly, statements that describe our objectives, plans or goals are or may be forward-looking statements.

These forward-looking statements or forecasts involve known and unknown risks, uncertainties and other factors that may cause AngloGold Ashanti’s actual results, performance, actions or achievements to differ materially from the anticipated results, performance, actions or achievements expressed or implied in these forward-looking statements. Although AngloGold Ashanti believes that the expectations reflected in such forward-looking statements and forecasts are reasonable, no assurance can be given that such expectations will prove to have been correct. Accordingly, results, performance, actions or achievements could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in economic, social, political and market conditions, including related to inflation or international conflicts, the success of business and operating initiatives, changes in the regulatory environment and other government actions, including environmental approvals, fluctuations in gold prices and exchange rates, the outcome of pending or future litigation proceedings, any supply chain disruptions, any public health crises, pandemics or epidemics, the failure to maintain effective internal control over financial reporting or effective disclosure controls and procedures, the inability to remediate one or more material weaknesses, or the discovery of additional material weaknesses, in the Company’s internal control over financial reporting, and other business and operational risks and challenges and other factors, including mining accidents. For a discussion of such risk factors, refer to the Company’s annual report on Form 20-F for the financial year ended 31 December 2025, filed with the U.S. Securities Exchange Commission. These factors are not necessarily all of the important factors that could cause AngloGold Ashanti’s actual results, performance, actions or achievements to differ materially from those expressed in any forward-looking statements. Other unknown or unpredictable factors could also have material adverse effects on AngloGold Ashanti’s future results, performance, actions or achievements. Consequently, readers are cautioned not to place undue reliance on forward-looking statements.

AngloGold Ashanti undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after the date of publication or to reflect the occurrence of unanticipated events, except to the extent required by applicable law. All subsequent written or oral forward-looking statements attributable to AngloGold Ashanti or any person acting on its behalf are qualified by the cautionary statements herein.

NON-GAAP financial measures

This document may contain certain “Non-GAAP” financial measures, including, without limitation, “total cash costs”, “total cash costs per ounce”, “all-in sustaining costs”, “all-in sustaining costs per ounce”, “average gold price received per ounce”, “sustaining capital expenditure”, “non-sustaining capital expenditure”, “Adjusted EBITDA”, “Adjusted net debt (cash)”, “operating cash flow” and “free cash flow”. AngloGold Ashanti utilises certain Non-GAAP performance measures and ratios in managing its business. Non-GAAP financial measures should be viewed in addition to, and not as an alternative for, the reported operating results or cash flow from operations or any other measures of performance prepared in accordance with IFRS. In addition, the presentation of these measures may not be comparable to similarly titled measures other companies may use. Reconciliations from IFRS to the Non-GAAP financial measures used in this document can be found either in this document, or in AngloGold Ashanti’s Earnings Release for the three months and the year ended 31 December 2025, which is available on AngloGold Ashanti’s website, or in its annual report on Form 20-F for the financial year ended 31 December 2025 as filed with 
the SEC.

2025 Mineral Resource and Mineral Reserve information

The Mineral Resource and Mineral Reserve stated herein were prepared in compliance with Subpart 1300 of Regulation S-K (17 CFR § 229.1300) (“Regulation S-K 1300”). Refer to Item 1300 (Definitions) of Regulation S-K for the meaning of the terms used in AngloGold Ashanti’s Mineral Resource and Mineral Reserve reporting. The Mineral Resource and Mineral Reserve represent the amount of gold, copper, silver, sulphur and molybdenum estimated at 31 December 2025 and are based on information available at the time of estimation. Such estimates are, or will be, to a large extent, based on the prices of the respective commodities and interpretations of geologic data obtained from drill holes and other exploration techniques, which data may not necessarily be indicative of future results. The Mineral Resource and Mineral Reserve estimates are published at 31 December 2025, taking into account economic assumptions, changes to future production and capital costs, depletion, additions as well as any acquisitions or disposals during 2025. The legal tenure of each material property has been verified to the satisfaction of the accountable Qualified Person and all of the Mineral Reserve has been confirmed to be covered by the required mining permits or there exists a realistic expectation, based on applicable laws and regulations, that issuance of permits or resolution of legal issues necessary for mining and processing at a particular deposit will be accomplished in the ordinary course and in a timeframe consistent with AngloGold Ashanti’s (or its joint venture partners’) current mine plans. For the Mineral Reserve, the term “economically viable” means that profitable extraction or production has been established or analytically demonstrated in, at a minimum, a pre-feasibility study, to be economically viable under reasonable investment and market assumptions. Mineral Reserve is subdivided and reported, in order of increasing geoscientific knowledge and confidence, into Probable and Proven Mineral Reserve categories. Mineral Reserve is aggregated from the Probable and Proven Mineral Reserve categories. Ounces of gold or silver or pounds of copper or sulphur included in the Probable and Proven Mineral Reserve are estimated and reported as delivered to plant (i.e., the point where material is delivered to the processing facility) and exclude losses during metallurgical treatment. In compliance with Regulation S-K 1300, the Mineral Resource herein is reported as exclusive of the Mineral Reserve before dilution and other factors are applied, unless otherwise stated. Mineral Resource is subdivided and reported, in order of increasing geoscientific knowledge and confidence, into Inferred, Indicated and Measured Mineral Resource categories. Ounces of gold or silver or pounds of copper, sulphur or molybdenum included in the Inferred, Indicated and Measured Mineral Resource are those contained in situ prior to losses during extraction and processing. While it would be reasonable to expect that the majority of Inferred Mineral Resource would upgrade to Indicated Mineral Resource with continued exploration, due to the uncertainty of Inferred Mineral Resource, it should not be assumed that such upgrading will always occur.

If estimations must be revised due to significantly lower commodity prices, increases in operating costs, reductions in metallurgical recovery or other factors, the Mineral Resource or Mineral Reserve may not be mined or processed profitably. In addition, material write-downs of AngloGold Ashanti’s investment in its mining properties may be required, including impacts on goodwill, as well as increased amortisation, reclamation and closure charges. If AngloGold Ashanti determines that certain parts of its Mineral Resource or Mineral Reserve have become uneconomic, this may ultimately lead to a reduction in its reported aggregate Mineral Resource or Mineral Reserve, respectively. Consequently, if AngloGold Ashanti’s actual Mineral Resource and Mineral Reserve is less than current estimates, its business, prospects, results of operations and financial position may be materially impaired.

Pre-feasibility and feasibility studies for undeveloped ore bodies present estimated capital expenditure and operating costs based on anticipated tonnage and grades of ore to be mined and processed. Other factors underlying the estimations include, among others, the predicted configuration of the ore body, anticipated metal recovery rates, and estimated costs of operating and processing equipment and facilities. Actual operating and capital expenditure cost and economic returns on projects may differ significantly from original estimates. Further, it may take many years from the initial phases of exploration until commencement of production, during which time, the economic feasibility of production may change. The Mineral Resource is subject to further exploration and development, and is subject to additional risks, and no assurance can be given that they will eventually convert to Mineral Reserve.

For additional information, refer to Table 1 (Summary Mineral Resource) and Table 2 (Summary Mineral Reserve) to Paragraph (b) of Item 1303 (Summary disclosure) of Regulation S-K, which are in AngloGold Ashanti’s annual report on Form 20-F for the financial year ended 
31 December 2025 filed with the SEC. These summary tables include each class of Mineral Resource (Inferred, Indicated and Measured) together with total Measured and Indicated Mineral Resource, and each class of Mineral Reserve (Probable and Proven) together with total Mineral Reserve. The Mineral Resource at the end of the financial year ended 31 December 2025 was estimated using a gold price of $2,000/oz (2024: $1,900/oz), a copper price of $3.50/lb (2024: $3.50/lb), a silver price of $23.00/oz (2024: $23.00/oz) and a molybdenum price of $12.00/lb (2024: $12.00/lb), unless otherwise stated. The Mineral Reserve at the end of the financial year ended 31 December 2025 was estimated using a gold price of $1,700/oz (2024: $1,600/oz), a copper price of $3.10/lb (2024: $2.90/lb) and a silver price of $19.50/oz 
(2024: $19.50/oz), unless otherwise stated. The net difference between the Mineral Resource and Mineral Reserve at the end of the last completed financial year and the preceding financial year will be detailed for material properties, if applicable, in AngloGold Ashanti’s annual report on Form 20-F for the financial year ended 31 December 2025.

The Mineral Resource exclusive of Mineral Reserve is defined as the inclusive Mineral Resource less the Mineral Reserve before dilution and other factors are applied.