<>Integrated Report 2022

Our footprint

We are working to regain cost competitiveness with our peer group through the optimisation of our operating assets and by introducing new, lower cost production sources to our portfolio.

Our greenfields exploration tenements cover over 9,500km2 of highly prospective ground in six countries – Australia, Argentina, Brazil, Guinea, Tanzania, and the United States

Note:
Percentages indicate the ownership interest held by AngloGold Ashanti. All operations are 100%-owned unless otherwise indicated.

1 Argentina

2 Brazil

3 Colombia

  • Gramalote (50%) (1)
  • La Colosa
  • Quebradona

4 United States of America

  • Silicon
  • North Bullfrog (2)
  • Mother Lode (2)
  • Sterling (3)

Total production

0.569Moz (21%)

Total Mineral Reserve

(including projects):

7.19Moz

Average employed
(including contractors):

9,498 people

Notes
  1. Gramalote is managed by B2Gold
  2. North Bullfrog and Mother Lode acquired with acquisition of Corvus Gold Inc. (Corvus Gold) in January 2022
  3. Sterling, which includes the Crown Block deposit, acquired with acquisition of Coeur Sterling Inc. (Coeur Sterling) in November 2022

Operating cash flow * (contribution to Group including projects):

$129m (8%)

Capital expenditure (including projects):

$339m

Total community investment (including projects):

$6.4m


* Includes joint ventures

5 Guinea

6 Ghana

7 Democratic Republic of the Congo (DRC)

8 Tanzania

Total production

1.635Moz (60%)

Total Mineral Reserve (including projects):

20.59Moz

Average employed (including contractors):

19,807 people

Notes

  1. Kibali is operated by Barrick Gold Corporation (Barrick)

Operating cash flow *(contribution to Group including projects):

$1,108m (72%)

Capital expenditure (including projects):

$576m

Total community investment (including projects):

$10.2m

* Includes joint ventures

Total attributable production

0.538Moz (19%)

Total Mineral Reserve

(including projects):

2.63Moz

Average employed (including contractors):

1,532 people

Operating cash flow * (contribution to Group including projects):

$300m (20%)

Capital expenditure (including projects):

$202m

Total community investment (including projects):

$0.98m

  • * Includes joint ventures

2022 suite of reports

Share this page: